ARTCO-BELL CORPORATION OSHA Record

TEMPLE, Texas · Manufacturing (NAICS 337127)

Inspections

2

Citations

25

Current penalties

$257,183

Penalties may change through settlement or contest. An open case is not final.

Inspections

Inspection 347500639

Opened
May 21, 2024
Type
Referral
Case status
Open
Official OSHA record
StandardTypeIssuedInitial penaltyCurrent penalty
29 CFR 1910.107(l)(2)(ii)Spray Finishing Using Flammable MaterialsSeriousOct 10, 2024$8,296$8,296
29 CFR 1910.1053(d)(4)Respirable Crystalline SilicaSeriousOct 10, 2024$8,296$8,296
29 CFR 1910.1053(i)(2)Respirable Crystalline SilicaSeriousOct 10, 2024$8,296$8,296

Inspection 347458408

Opened
May 1, 2024
Type
Referral
Case status
Open
Official OSHA record
StandardTypeIssuedInitial penaltyCurrent penalty
29 CFR 1910.22(a)(1)Walking-Working SurfacesSeriousOct 10, 2024$6,222$6,222
29 CFR 1910.37(a)(3)Exit Routes – Maintenance & SafeguardsSeriousOct 10, 2024$8,296$8,296
29 CFR 1910.37(b)(1)Exit Routes – Maintenance & SafeguardsSeriousOct 10, 2024$6,222$6,222
29 CFR 1910.37(b)(6)Exit Routes – Maintenance & SafeguardsSeriousOct 10, 2024$8,296$8,296
29 CFR 1910.147(c)(4)(i)Control of Hazardous Energy (Lockout/Tagout)SeriousOct 10, 2024$14,518$14,518
29 CFR 1910.147(c)(5)(ii)(d)Control of Hazardous Energy (Lockout/Tagout)SeriousOct 10, 2024$6,222$6,222
29 CFR 1910.212(a)(1)Machine GuardingSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.212(a)(1)Machine GuardingSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.212(a)(1)Machine GuardingSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.212(a)(1)Machine GuardingSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.213(r)(1)Woodworking MachinerySeriousOct 10, 2024$14,518$14,518
29 CFR 1910.219(b)(1)Mechanical Power-Transmission ApparatusSeriousOct 10, 2024$10,372$10,372
29 CFR 1910.219(c)(2)(i)Mechanical Power-Transmission ApparatusSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.219(f)(1)Mechanical Power-Transmission ApparatusSeriousOct 10, 2024$0$0
29 CFR 1910.219(f)(3)Mechanical Power-Transmission ApparatusSeriousOct 10, 2024$10,372$10,372
29 CFR 1910.252(b)(2)(iii)Welding, Cutting & BrazingSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.303(b)(7)(i)Electrical – GeneralSeriousOct 10, 2024$12,445$12,445
29 CFR 1910.303(b)(8)(i)Electrical – GeneralSeriousOct 10, 2024$10,372$10,372
29 CFR 1910.303(g)(1)Electrical – GeneralSeriousOct 10, 2024$8,296$8,296
29 CFR 1910.303(g)(2)(i)Electrical – GeneralSeriousOct 10, 2024$14,518$14,518
29 CFR 1910.305(g)(2)(iii)Electrical – Wiring Methods & ComponentsSeriousOct 10, 2024$8,296$8,296
29 CFR 1910.1200(f)(6)(ii)Hazard CommunicationSeriousOct 10, 2024$6,222$6,222

Other OSHA records in TEMPLE and Texas

More OSHA data

Get alerts when Texas manufacturing companies are cited

Start free trial

Source: U.S. Department of Labor public enforcement data, as of Oct 22, 2026. OSHAlert is not affiliated with OSHA.

Penalties may change through settlement or contest. An open case is not final.

See something wrong? Email support@oshalert.com.